العربية
Yes, but you will need to provide complete specifications. Please specify the equipment’s installation dimensions (shaft diameter, mounting hole locations), operating power/speed, and operating conditions (such as high temperature/high humidity/explosion-proof environments, and load types). If necessary, equipment drawings or 3D models can be provided to ensure a seamless fit between the motor and the equipment.
A formal quote will include basic production costs, standard customization fees (such as parameter adjustments), and taxes, but special items must be confirmed in advance. Mold costs (such as custom housings) and expedited fees may be calculated separately.
The lead time varies depending on the situation: conventional customization (changing parameters of existing models) takes 7-20 days, and new design (requiring mold opening/re-development) takes 30-90 days.
We can accept orders for 1-2 samples, but there are two minor details to consider:
1. The price includes basic customization costs. If mold making is required (e.g., for a special housing), a small mold-making fee will be charged. This fee will be refunded when you place a subsequent bulk order.
2. The lead time is slightly longer than mass production, approximately 15-20 days. We will prioritize production to ensure samples are shipped to you as quickly as possible.
The default protection level is IP54 (dustproof + splashproof) and insulation class F (temperature resistance 155°C). If used in humid environments (such as aquatic workshops), it can be upgraded to IP65. A dust cover can be added for dusty environments. The insulation level can also be upgraded to class H or C (temperature resistance 220°C+) for high-temperature conditions. Specific customization is possible based on the user’s environment.
If you’re adjusting parameters on an existing motor (such as changing the shaft diameter, power, or protection level), you can order 1-5 units and have quick delivery. If you need a completely new design (such as a special housing or non-standard mounting structure), the lead time will be longer and the minimum order quantity will be higher because of the mold opening and dedicated R&D. We can clarify the type of motor you need and the adjustments required, so we can help you determine a more accurate minimum order quantity and plan.”